Fuzzy cognitive mapping in support of integrated ecosystem assessments: Developing a shared conceptual model among stakeholders

James M. Vasslides, Olaf Jensen

Research output: Contribution to journalArticle

28 Citations (Scopus)

Abstract

Ecosystem-based approaches, including integrated ecosystem assessments, are a popular methodology being used to holistically address management issues in social-ecological systems worldwide. In this study we utilized fuzzy logic cognitive mapping to develop conceptual models of a complex estuarine system among four stakeholder groups. The average number of categories in an individual map was not significantly different among groups, and there were no significant differences between the groups in the average complexity or density indices of the individual maps. When ordered by their complexity scores, eight categories contributed to the top four rankings of the stakeholder groups, with six of the categories shared by at least half of the groups. While non-metric multidimensional scaling (nMDS) analysis displayed a high degree of overlap between the individual models across groups, there was also diversity within each stakeholder group. These findings suggest that while all of the stakeholders interviewed perceive the subject ecosystem as a complex series of social and ecological interconnections, there are a core set of components that are present in most of the groups' models that are crucial in managing the system towards some desired outcome. However, the variability in the connections between these core components and the rest of the categories influences the exact nature of these outcomes. Understanding the reasons behind these differences will be critical to developing a shared conceptual model that will be acceptable to all stakeholder groups and can serve as the basis for an integrated ecosystem assessment.

Original languageEnglish (US)
Pages (from-to)348-356
Number of pages9
JournalJournal of Environmental Management
Volume166
DOIs
StatePublished - Jan 15 2016

Fingerprint

Ecosystems
stakeholder
ecosystem
Fuzzy logic
fuzzy mathematics
integrated approach
ranking
methodology

All Science Journal Classification (ASJC) codes

  • Environmental Engineering
  • Waste Management and Disposal
  • Management, Monitoring, Policy and Law

Keywords

  • Barnegat bay
  • Ecosystem based management
  • FCM
  • Fuzzy logic cognitive mapping

Cite this

@article{6bde519a660541b6b621a99af0810d24,
title = "Fuzzy cognitive mapping in support of integrated ecosystem assessments: Developing a shared conceptual model among stakeholders",
abstract = "Ecosystem-based approaches, including integrated ecosystem assessments, are a popular methodology being used to holistically address management issues in social-ecological systems worldwide. In this study we utilized fuzzy logic cognitive mapping to develop conceptual models of a complex estuarine system among four stakeholder groups. The average number of categories in an individual map was not significantly different among groups, and there were no significant differences between the groups in the average complexity or density indices of the individual maps. When ordered by their complexity scores, eight categories contributed to the top four rankings of the stakeholder groups, with six of the categories shared by at least half of the groups. While non-metric multidimensional scaling (nMDS) analysis displayed a high degree of overlap between the individual models across groups, there was also diversity within each stakeholder group. These findings suggest that while all of the stakeholders interviewed perceive the subject ecosystem as a complex series of social and ecological interconnections, there are a core set of components that are present in most of the groups' models that are crucial in managing the system towards some desired outcome. However, the variability in the connections between these core components and the rest of the categories influences the exact nature of these outcomes. Understanding the reasons behind these differences will be critical to developing a shared conceptual model that will be acceptable to all stakeholder groups and can serve as the basis for an integrated ecosystem assessment.",
keywords = "Barnegat bay, Ecosystem based management, FCM, Fuzzy logic cognitive mapping",
author = "Vasslides, {James M.} and Olaf Jensen",
year = "2016",
month = "1",
day = "15",
doi = "10.1016/j.jenvman.2015.10.038",
language = "English (US)",
volume = "166",
pages = "348--356",
journal = "Journal of Environmental Management",
issn = "0301-4797",
publisher = "Academic Press Inc.",

}

TY - JOUR

T1 - Fuzzy cognitive mapping in support of integrated ecosystem assessments

T2 - Developing a shared conceptual model among stakeholders

AU - Vasslides, James M.

AU - Jensen, Olaf

PY - 2016/1/15

Y1 - 2016/1/15

N2 - Ecosystem-based approaches, including integrated ecosystem assessments, are a popular methodology being used to holistically address management issues in social-ecological systems worldwide. In this study we utilized fuzzy logic cognitive mapping to develop conceptual models of a complex estuarine system among four stakeholder groups. The average number of categories in an individual map was not significantly different among groups, and there were no significant differences between the groups in the average complexity or density indices of the individual maps. When ordered by their complexity scores, eight categories contributed to the top four rankings of the stakeholder groups, with six of the categories shared by at least half of the groups. While non-metric multidimensional scaling (nMDS) analysis displayed a high degree of overlap between the individual models across groups, there was also diversity within each stakeholder group. These findings suggest that while all of the stakeholders interviewed perceive the subject ecosystem as a complex series of social and ecological interconnections, there are a core set of components that are present in most of the groups' models that are crucial in managing the system towards some desired outcome. However, the variability in the connections between these core components and the rest of the categories influences the exact nature of these outcomes. Understanding the reasons behind these differences will be critical to developing a shared conceptual model that will be acceptable to all stakeholder groups and can serve as the basis for an integrated ecosystem assessment.

AB - Ecosystem-based approaches, including integrated ecosystem assessments, are a popular methodology being used to holistically address management issues in social-ecological systems worldwide. In this study we utilized fuzzy logic cognitive mapping to develop conceptual models of a complex estuarine system among four stakeholder groups. The average number of categories in an individual map was not significantly different among groups, and there were no significant differences between the groups in the average complexity or density indices of the individual maps. When ordered by their complexity scores, eight categories contributed to the top four rankings of the stakeholder groups, with six of the categories shared by at least half of the groups. While non-metric multidimensional scaling (nMDS) analysis displayed a high degree of overlap between the individual models across groups, there was also diversity within each stakeholder group. These findings suggest that while all of the stakeholders interviewed perceive the subject ecosystem as a complex series of social and ecological interconnections, there are a core set of components that are present in most of the groups' models that are crucial in managing the system towards some desired outcome. However, the variability in the connections between these core components and the rest of the categories influences the exact nature of these outcomes. Understanding the reasons behind these differences will be critical to developing a shared conceptual model that will be acceptable to all stakeholder groups and can serve as the basis for an integrated ecosystem assessment.

KW - Barnegat bay

KW - Ecosystem based management

KW - FCM

KW - Fuzzy logic cognitive mapping

UR - http://www.scopus.com/inward/record.url?scp=84945925908&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84945925908&partnerID=8YFLogxK

U2 - 10.1016/j.jenvman.2015.10.038

DO - 10.1016/j.jenvman.2015.10.038

M3 - Article

C2 - 26520042

AN - SCOPUS:84945925908

VL - 166

SP - 348

EP - 356

JO - Journal of Environmental Management

JF - Journal of Environmental Management

SN - 0301-4797

ER -