T1 - Optimization of Deck Construction Staging for Multiple-Span Continuous Steel Girder Bridge
AU - Su, Dan
AU - Nassif, Hani
AU - Xia, Ye
N1 - Funding Information:
The authors would like to thank the New Jersey Turnpike Authority and staff member William Wilson. The authors also would like to thank the students Peng Lou, Khalid Machich, and Zeeshan Ghanchi, and postdoctoral research associates Chaekuk Na and Yingjie Wang for their help during the field testing. The support for the corresponding author by Open Research Fund Program of Jiangsu Key Laboratory of Engineering Mechanics, Southeast University (Grant No. LEM16B09), National Natural Science Foundation of China (Grant No. 51508405), and Ministry of Transport of the People’s Republic of China (Grant No. 2015318J38230) is greatly acknowledged.
Publisher Copyright:
© 2017 American Society of Civil Engineers.
PY - 2018/2/1
Y1 - 2018/2/1
N2 - Cracking in concrete deck has been the major concern to bridge designers as well as owners. Excessive cracking not only would affect the performance and serviceability of the bridge but also reduce the service life of the concrete deck and increase the maintenance cost. It is proven that many factors could cause the cracking of concrete deck including restrained shrinkage, temperature effects, applied live load, and improper construction sequence. Among these factors, appropriate construction staging plays an important role in minimizing the cracking of concrete deck, especially for multiple span continuous bridges. However, the construction staging has not been subjected to detailed research in the past. Therefore, it is important to evaluate the current concrete deck construction staging practice and propose an optimized construction staging for multiple span continuous bridges, if needed. In this study, the research approach adopted is aimed at investigating the cracking of a typical multiple-span continuous bridge, evaluating the construction staging, and providing an optimized practice for deck construction staging. A typical three-span continuous bridge was selected for investigation and various types of sensors were instrumented on the bridge to monitor the behavior of the structure during and after construction. The finite-element (FE) model was developed and validated with the data collected from field testing. Based on FE analysis and experimental data, the cracking of the bridge deck was investigated and alternative construction staging scenarios were simulated and compared. Moreover, based on analysis results, an optimized deck construction staging practice was recommended for future use.
AB - Cracking in concrete deck has been the major concern to bridge designers as well as owners. Excessive cracking not only would affect the performance and serviceability of the bridge but also reduce the service life of the concrete deck and increase the maintenance cost. It is proven that many factors could cause the cracking of concrete deck including restrained shrinkage, temperature effects, applied live load, and improper construction sequence. Among these factors, appropriate construction staging plays an important role in minimizing the cracking of concrete deck, especially for multiple span continuous bridges. However, the construction staging has not been subjected to detailed research in the past. Therefore, it is important to evaluate the current concrete deck construction staging practice and propose an optimized construction staging for multiple span continuous bridges, if needed. In this study, the research approach adopted is aimed at investigating the cracking of a typical multiple-span continuous bridge, evaluating the construction staging, and providing an optimized practice for deck construction staging. A typical three-span continuous bridge was selected for investigation and various types of sensors were instrumented on the bridge to monitor the behavior of the structure during and after construction. The finite-element (FE) model was developed and validated with the data collected from field testing. Based on FE analysis and experimental data, the cracking of the bridge deck was investigated and alternative construction staging scenarios were simulated and compared. Moreover, based on analysis results, an optimized deck construction staging practice was recommended for future use.
KW - Construction staging
KW - Continuous bridge
KW - Crack control
KW - Field testing
KW - Finite-element model
UR - http://www.scopus.com/inward/record.url?scp=85035324138&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85035324138&partnerID=8YFLogxK
U2 - 10.1061/(ASCE)CF.1943-5509.0001073
DO - 10.1061/(ASCE)CF.1943-5509.0001073
M3 - Article
AN - SCOPUS:85035324138
SN - 0887-3828
VL - 32
JO - Journal of Performance of Constructed Facilities
JF - Journal of Performance of Constructed Facilities
IS - 1
M1 - 04017124
ER -