TY - JOUR
T1 - Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention
AU - Wang, Zhaojing
AU - Hu, Hao
AU - Gong, Jie
N1 - Funding Information:
The authors express their sincere gratitude to Shanghai Jiangong Construction material Company for assistance in observation and conducting on-site interviews. They also appreciate the project engineers for valuable information and useful data. Additionally, this research is supported by the “Key Technology and Development Program in Shanghai ( 14DZ1207101 )” of the Shanghai Commission of Science and Technology .
Publisher Copyright:
© 2017 Elsevier Ltd
PY - 2018/3/10
Y1 - 2018/3/10
N2 - Disturbances are inevitable and ubiquitous in the precast supply chain. Systematic evaluations of the impact of individual disturbances to prioritize the prevention of various disturbances are critical for realizing the full potential of logistical profits. This is especially true when the disturbance prevention budget is insufficient. Whereas, existing studies focused primarily on single disturbance analyses or precautions evaluation. This study proposes an overall disturbance evaluation model to assess the uncertainty of precast supply chain. The model is developed using ARENA-based discrete event simulation methods, and aims to address the lack of systematic multiple disturbances evaluation before the implementation of precaution measures. The model constructs include a real-world precast supply chain environment which considers four categories of disturbances derived from suppliers, manufacturers, logistics, and customers. In the model, the importance of disturbance is evaluated from both operational and economic perspectives, and the upper bound for the implementation cost of each precaution measure is provided. Finally, eleven scenarios with different levels of exposure to disturbances are investigated to test the validity of the proposed approach. Numerical results indicate that system failure is the most critical disturbance in this precast supply chain, followed by PC quality problem, PC reproduction owing to repair failure, and the material quality problem. The findings could facilitate the multiple disturbance management in the precast supply chain.
AB - Disturbances are inevitable and ubiquitous in the precast supply chain. Systematic evaluations of the impact of individual disturbances to prioritize the prevention of various disturbances are critical for realizing the full potential of logistical profits. This is especially true when the disturbance prevention budget is insufficient. Whereas, existing studies focused primarily on single disturbance analyses or precautions evaluation. This study proposes an overall disturbance evaluation model to assess the uncertainty of precast supply chain. The model is developed using ARENA-based discrete event simulation methods, and aims to address the lack of systematic multiple disturbances evaluation before the implementation of precaution measures. The model constructs include a real-world precast supply chain environment which considers four categories of disturbances derived from suppliers, manufacturers, logistics, and customers. In the model, the importance of disturbance is evaluated from both operational and economic perspectives, and the upper bound for the implementation cost of each precaution measure is provided. Finally, eleven scenarios with different levels of exposure to disturbances are investigated to test the validity of the proposed approach. Numerical results indicate that system failure is the most critical disturbance in this precast supply chain, followed by PC quality problem, PC reproduction owing to repair failure, and the material quality problem. The findings could facilitate the multiple disturbance management in the precast supply chain.
KW - Discrete event simulation
KW - Disturbance prevention
KW - Precast components
KW - Precast supply chain management
KW - Priority evaluation
UR - http://www.scopus.com/inward/record.url?scp=85041138187&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85041138187&partnerID=8YFLogxK
U2 - 10.1016/j.jclepro.2017.12.188
DO - 10.1016/j.jclepro.2017.12.188
M3 - Article
AN - SCOPUS:85041138187
SN - 0959-6526
VL - 177
SP - 232
EP - 244
JO - Journal of Cleaner Production
JF - Journal of Cleaner Production
ER -